A place for life and health
The public clinic poster says it plainly: together we are building a clinic for the Libala area. The needs listed there are the shell of the building, 200 m²; construction crews; a solar system and a well; medical equipment and medicine; and long-term professional training for local doctors.
The printed target was June 2026. The printed budget was €30,000. We are not publishing a progress claim the poster does not make. For where the work stands, write to us.